Skip to content
Admine EnergyAdmine Energy

Industrial heat vs power-plant biomass fuel buying

Power plants often buy large continuous tonnage with strict moisture and ash discipline. Industrial heat users may take smaller lots but still need on-time trucks around production shifts.

Both should brief product, moisture caps, and gate windows. Heat users should also flag weekend or night receiving limits early.

Do not assume a power-plant PKS contract structure fits a factory steam boiler without checking storage and feeder limits.

Admine aligns Thai deliveries to the buyer’s plant type after volume and receiving rules are clear.