Switching an industrial boiler to biomass fuel in Thailand
Fuel switching fails when engineering and procurement brief different products. Lock which fuels the grate or fluidised bed can accept before shopping for tonne prices.
Start with moisture and ash caps, storage space, truck access, and a test-burn plan—not a full-year contract on day one.
PKS, wood chip, and EFB are not interchangeable without checking feeders and emissions behaviour.
Admine supports Thai trial and ongoing volumes once product, receiving rules, and delivery point are clear.
Talk volume and moisture